Saltar al contenido Skip to content
01 / 07 Mixed use  |  Tocancipá, Colombia

Milán Plaza Shopping Center

  • 100% of cross-discipline clashes resolved in digital
  • $0 spent on on-site demolition.

Full coordination of a “small city” — retail, hotel, offices and housing — inside a single digital prototype, before any physical investment began.

View full case study
02 / 07 Institutional facility  |  Tocancipá, Colombia

Tocancipá Auditorium

  • 0 walls demolished because of duct crossings
  • MEP and lighting synchronized at $0.

Design and integration of plumbing, electrical, mechanical, audio and lighting systems inside one centralized model with demanding technical requirements.

View full case study
03 / 07 Roadway infrastructure  |  Client: C&C Castelblanco

Roadway Development and Underground Utilities

  • 0 unplanned heavy-machinery stoppages caused by underground interference.

Geometric layout of the road corridor, integrated with the existing utility networks to guarantee uninterrupted execution from day one.

View full case study
04 / 07 Single-family home  |  Cota, Colombia

Cota Single-Family Home

  • 100% of decisions validated before the first stone was laid
  • $0 spent on on-site redesign.

Complete modeling of spatial layout, finishes and construction details, to eliminate last-minute adjustments during construction.

View full case study
05 / 07 Conceptual exploration  |  3D modeling

Massing and Solar Analysis

  • Commercial certainty and validated investment from the schematic design phase.

Early evaluation of massing, daylight and relationship to the surroundings, so design and investment decisions can be made without committing capital.

View full case study
06 / 07 Specialized systems  |  A/V and lighting

Spatial Systems and Lighting

  • Integrated systems, with no improvised installations or exposed conduit on site.

Architectural lighting and sound built into the 3D prototype from the earliest stages, so the technology and the architecture speak the same language.

View full case study
07 / 07 Ongoing consultancy  |  New York, USA

International Reach — ATS

  • 5 consecutive years running as their outsourced BIM department.

Standardization and ongoing BIM coordination for international projects, delivering continuous technical accuracy with no fixed payroll cost.

View full case study