Milán Plaza Shopping Center
- 100% of cross-discipline clashes resolved in digital
- $0 spent on on-site demolition.
Full coordination of a “small city” — retail, hotel, offices and housing — inside a single digital prototype, before any physical investment began.
View full case studyTocancipá Auditorium
- 0 walls demolished because of duct crossings
- MEP and lighting synchronized at $0.
Design and integration of plumbing, electrical, mechanical, audio and lighting systems inside one centralized model with demanding technical requirements.
View full case studyRoadway Development and Underground Utilities
- 0 unplanned heavy-machinery stoppages caused by underground interference.
Geometric layout of the road corridor, integrated with the existing utility networks to guarantee uninterrupted execution from day one.
View full case studyCota Single-Family Home
- 100% of decisions validated before the first stone was laid
- $0 spent on on-site redesign.
Complete modeling of spatial layout, finishes and construction details, to eliminate last-minute adjustments during construction.
View full case studyMassing and Solar Analysis
- Commercial certainty and validated investment from the schematic design phase.
Early evaluation of massing, daylight and relationship to the surroundings, so design and investment decisions can be made without committing capital.
View full case studySpatial Systems and Lighting
- Integrated systems, with no improvised installations or exposed conduit on site.
Architectural lighting and sound built into the 3D prototype from the earliest stages, so the technology and the architecture speak the same language.
View full case studyInternational Reach — ATS
- 5 consecutive years running as their outsourced BIM department.
Standardization and ongoing BIM coordination for international projects, delivering continuous technical accuracy with no fixed payroll cost.
View full case study