Milán Plaza Shopping Center
- 100% of cross-discipline clashes resolved digitally
- $0 in on-site demolition.
Full coordination of a “small city” (retail, hotel, offices, and housing) within a single digital prototype before physical investment began.
View full case studyTocancipá Auditorium
- 0 walls demolished for unplanned duct or utility crossings
- 100% of MEP, audio, and lighting systems synchronized digitally at $0.
Design and integration of plumbing, electrical, mechanical, audio, and lighting systems in a centralized model built for high technical demands.
View full case studyRoad Development and Underground Utilities
- 0 unplanned stoppages of heavy machinery
- 100% of underground utility conflicts resolved before excavation.
Geometric layout of the road corridor integrated with existing utility networks to ensure continuous execution from day one.
View full case studyCota Single-Family Home
- 100% of decisions validated before breaking ground
- $0 in on-site redesigns.
Comprehensive modeling of spatial layout, finishes, and construction details to eliminate last-minute adjustments during construction.
View full case studySpatial Systems and Lighting
- 0 exposed conduits or improvised installations on site
- 100% of light and sound systems in dialogue with the architecture.
Integration of technical lighting and sound into the 3D prototype from early stages, so technology and architecture speak to each other.
View full case studyInternational Reach — ATS
- 5 consecutive years as a recurring B2B partner
- 100% compliance with international coordination standards.
Recurring BIM standardization and coordination for international projects, delivering continuous technical precision without fixed payroll costs.
View full case studyData Center and Server Room Modeling
- 5 fire-sealed cable penetration points, planned before the floor was built — so it never had to be broken open later
- Tray, piping, and detection conflicts resolved in the model before construction.
BIM modeling and technical coordination of the data center and server room, resolving interferences digitally before installation.
View full case study